REALHUB is on fire today

Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular features

Community features

Property features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

SOUTHERN CHARMER ON 1 ACRE! This 3bd2.5bth home is settled on a beautifully groomed lot.This home features a spacious kitchen,dining area,large bedrooms,lots of closets space,a sizeable laundry room,and a 2 car attached garage! This VERY WELL MAINTAINED HOME also offers a large deck that overlooks and private wooded backyard that features a storage shed and custom basketball court. This home also qualifies for 100% financing.
#P1102828

Lancaster

4149 Major Evans Rd

2 Beds

1 Baths

1,780 Sq.Ft.

$143,000

MLS#: P1102828

RARE FIND in much sought after Calloway Neighborhood of Tega Cay (maintenance free). 1 ½ story home with open floor plan featuring beautiful hardwood flooring, gleaming granite countertops with great work space, SS appliances (gas stove), tile backsplash, under cabinet lighting and lower cabinets with easy slide shelving for convenience. Spacious Master Suite with luxurious bath and closet. Plenty of natural light. One of three bedrooms on main level has been converted into a home office with professionally designed built-ins. Loft area with full bath can be 4th bedroom/game room/workout area or hobby room.  Large walk-n storage space is climate controlled. Oversized garage with sink.  Home is situated on a level corner lot for more privacy with extra-large patio off the screened in porch.  ROOF replaced in 2019!
#3934202

Tega Cay

1003 Knob Creek Lane

4 Beds

3 Baths

2,294 Sq.Ft.

$491,000

MLS#: 3934202

Gorgeous home! This well maintained home sits on 5 acres. Home has fenced in front and back pasture. Large split bedroom floor plan. Master on main along with guest bedroom. Upstairs is 2 additional bedrooms, separate den, full bath, and walk in attic. Great room features a beautiful fireplace with windows on either side. Master bath has steps leading up to huge tub. Separate shower and double vanity. The kitchen has a island and a ton of cabinets w/ rollouts. This is not one to miss.
#P1105786

McConnells

374 Greenglen

3 Beds

2 Baths

3,085 Sq.Ft.

$274,900

MLS#: P1105786

Large lot - great location.
#P1095839

Rock Hill

1882 Twin Lakes Rd.

6 Beds

None Baths

N/A

$17,200

MLS#: P1095839

This stunning corner-lot home on a cul-de-sac showcases impeccable design inside and out. A rocking chair front porch and screened-in back porch create inviting outdoor spaces. The chef’s kitchen boasts a waterfall quartz island, brushed gold finishes, a farmhouse sink, GE Monogram appliances, a gas range with double ovens, stacked cabinets, and a chimney hood. Custom cabinetry and detailed moulding elevate the interior, complemented by real hardwood floors throughout the first floor, stairs, upstairs hall, primary suite, and bonus room. The primary suite offers a tray ceiling, custom walk-in closet, and spa-like bath with a standalone tub, dual vanities, quartz countertops, and a tiled walk-in shower. Upstairs are four bedrooms, including one with a Jack-and-Jill bath, a large bonus room, and a spacious laundry room. Additional highlights include motorized shades, plantation shutters, a three-car garage, whole-house water filtration, and an encapsulated crawl space.
#4211547

Fort Mill

1812 Pin Oak Court

6 Beds

4 Baths

3,710 Sq.Ft.

$1,099,000

MLS#: 4211547

Great location, ideal for family daycare, school, church, or could also be used for residential home.
#3233660

Rock Hill

HWY 196 Twin Lakes Road

None Beds

None Baths

1.0 acres

$17,000

MLS#: 3233660

Spacious, elegant, loaded with beautiful features and upgrades.  Backing to woods this home offers a nicely landscaped play yard with a patio and fire pit, delightful chef's kitchen, pretty cherry hardwood flooring, accented by a stone fireplace, guest suite & full bath on main.  Gorgeous Master Suite on second level, along w three bedrooms and huge bonus room.  Basement offers a large recreation room, media room, exercise & an additional bedroom/full bath with tons of storage. Fort Mill Schools
#3075054

Fort Mill

513 Quicksilver Trail

6 Beds

5 Baths

5,504 Sq.Ft.

$490,000

MLS#: 3075054

Affordable one-level living in a quiet, rural setting with no HOA; a rare combination for buyers seeking simplicity and value. This updated home offers easy, low-maintenance living in a peaceful area while still being close enough for everyday conveniences. The layout is functional and inviting, making it ideal for first-time homebuyers or those looking to downsize to something quaint and cost-effective without sacrificing comfort. Thoughtful updates enhance the home’s charm and move-in-ready appeal, allowing you to settle in and enjoy from day one. If you’re looking for a home that’s affordable, practical, and free from unnecessary extras, this one delivers exactly that! Simple living done right.
#4334082

York

777 Pollys Circle

3 Beds

2 Baths

914 Sq.Ft.

$150,000

MLS#: 4334082

Live in LUXURY the SMART way! Nestled in an equestrian community w/ plantation-size homesites of 5-15+ acres, this European style full brick home is rich w/ exquisite finishes: rustic oak beam, coffered ceiling, hand forged iron entrance door, stone fireplace, and solid black walnut mantel. Dream kitchen has marble counters, professional energy star appliances, solid maple cabinets & walk-in pantry. Energy efficient w/ spray foam insulation & low E windows. Prewired for full automation!
#3251921

York

1419 Sherrer Road

4 Beds

3 Baths

5,585 Sq.Ft.

$700,000

MLS#: 3251921

Awesome water view with a dock.  Come build your beautiful dream home on Lake Wylie!
#P1095914

York

1766 Old Clay Hill

None Beds

None Baths

1.0 acres

$289,900

MLS#: P1095914

Welcome to Merriweather Manor at Mountain Lakes; subdivision on the water that was planned and never developed. Lot #22 is a true gem that needs a developer or buyer with a vision to come in and create a lakeside getaway or a dream home with a dream view. When you visit this lot, the peace and solitude of nature is uncanny and unbeatable. It is nestled on Mountain Lake 1, a 42-acre lake managed by SCDNR and stocked with largemouth bass, bluegill, shell cracker, and channel catfish. Mountain Lakes is equal distance from Charlotte, NC & Columbia, SC, and just a few miles from Chester State Park & Chester Golf Club. Come snatch a piece of lakefront property and make it yours! Disclaimers: No gas powered boats on lake, ground photos of the lake taken at a clearing to the right of lot #22, property has not been perc'd and will be responsibility of buyer, subdivision plat is available from 2005. Merriweather Manor lots have covenants and restrictions but there is currently no active HOA.
#4081737

Chester

Lot 22 Mountain Lakes Road

None Beds

None Baths

N/A

$89,500

MLS#: 4081737

AS IS SALE!  Great ranch home sits on almost an acre!  Tons of room to grow.  Large great room with fireplace, dining room, spacious kitchen.  Huge master bedroom, flex room could be used as a bonus room or office.  Dining area has a beautiful bay window.  Deck, two storage sheds, outdoor fireplace and fenced back yard.
#P1097016

Rock Hill

836 Museum Road

2 Beds

1 Baths

2,262 Sq.Ft.

$139,900

MLS#: P1097016

Saussy Burbank home in the desirable Riverwalk community! This gorgeous home has a covered front porch nearly spanning the width of the home, a rear covered porch AND faces a scenic green space. Attention to detail shown throughout, with sitefinished hardwoods, built-ins and beautiful molding throughout. The entryway greets you with a formal dining room and open office with custom book shelves spanning the entire wall. The gourmet kitchen offers white floor to ceiling cabinetry, gas cooktop, stainless still hood vent, double ovens and large granite island. Enjoy relaxing in the living room with gas fireplace centered by built-ins. Head upstairs to find 4 bedrooms and 3 full bathrooms! The primary bedroom boasts a walk in shower, soaker tub dual vanity sinks AND custom closet. Riverwalk allows you to play where you live! Enjoy the Riverwalk path along the Catawba River, community pool, shopping, restaurants and paddleboard launch site!
#4173015

Rock Hill

1088 Ridge Runner Road

4 Beds

3 Baths

2,712 Sq.Ft.

$615,000

MLS#: 4173015

What a dollhouse!  This home has an updated kitchen with solid surface counter tops, stainless appliances and ceramic tile flooring!  Formal dining room, great room with fireplace/gas logs.  Two bedrooms and updated bath!  Great fenced back yard with privacy fence on left side, storage shed, deck, front porch, gutter guards.  Replacement windows throughout, full irrigation!
#P1092135

Rock Hill

1000 Beverly Drive

1 Beds

None Baths

1,129 Sq.Ft.

$134,900

MLS#: P1092135

Move-in ready oversized ranch w/bonus/media room over the garage. Large great rm w/vaulted ceiling and fireplace, great dining area open to kitchen & great rm. Spacious master suite includes vaulted ceiling, sitting room w/custom bookcases, walk-in closet, large master suite bath w/dual sink vanity. Doors in master enlarged for wheelchair access. Large pantry and linen closet. Sunroom, patio, fenced yard, end of culdesac for added privacy.
#3155747

Indian Land

1545 Kingdom Way

3 Beds

2 Baths

1,686 Sq.Ft.

$199,000

MLS#: 3155747

1 ... 194 195 196 197 198 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.